How much did Evergreen Point Floating Bridge cost to build?
The Evergreen Point Floating Bridge is the SR 520 floating bridge across Lake Washington in Seattle, replaced by the Floating Bridge and Landings Project built by the Kiewit/General/Manson joint venture, which opened to drivers in April 2016 with all final remaining work complete in summer 2017. The Washington State Department of Transportation states that the final cost of that project was approximately 849 million dollars, covering design work done before construction and land acquisition.
Final project cost
$849 million
Cost basis: 2017
Cost evidence
Basis of the published figure
Project record