How much did Evergreen Point Floating Bridge cost to build?

The Evergreen Point Floating Bridge is the SR 520 floating bridge across Lake Washington in Seattle, replaced by the Floating Bridge and Landings Project built by the Kiewit/General/Manson joint venture, which opened to drivers in April 2016 with all final remaining work complete in summer 2017. The Washington State Department of Transportation states that the final cost of that project was approximately 849 million dollars, covering design work done before construction and land acquisition.

Final project cost

$849 million

Cost basis: 2017

The Evergreen Point Floating Bridge, carrying State Route 520 over Lake Washington, seen from the north side bicycle and pedestrian trail from the west high-rise.
SounderBruceCC BY-SA 4.0

Cost evidence

Basis of the published figure

Final project cost2017
en.wikipedia.org

Project record

Timeline