What was the emergency budget for replacing Pittsburgh's Fern Hollow Bridge?
After Pittsburgh's Fern Hollow Bridge collapsed in January 2022, Pennsylvania delivered a replacement in less than eleven months. The American Society of Civil Engineers reported a $25.3 million budget for the emergency rebuilding project. That budget belongs to the 2022 replacement, not to the 1973 bridge that failed.
Approved budget
$25.3 million
Cost basis: 2022
Mr. Matt茅 (if there is an issue with this image, contact me using this image's Commons talk page, my Commons user talk page, or my English Wikipedia user talk page; I'll know about it a lot faster)CC BY-SA 4.0
Cost evidence
Basis of the published figure
Approved budget2022
Project metrics
Key dimensions
- Total lengthAmerican Society of Civil Engineers
- 140.208 m
Project record
Opened or launched
American Society of Civil Engineers2022