What total cost did Dubai's Roads and Transport Authority report for the completed 2007 Floating Bridge?
Dubai's Floating Bridge spans Dubai Creek between Deira and Bur Dubai. Completed in 2007, the 360-metre temporary crossing has three traffic lanes in each direction and a movable section for marine traffic. Dubai Roads and Transport Authority chairman Mattar Al Tayer reported a total project cost of AED 155 million. This figure prices the Floating Bridge, not the separate Business Bay Crossing or a future permanent crossing.
Reported project cost
AED 155 million
Approximately $42.21 million
Cost basis: 2007
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthkhaleejtimes.com
- 365 m
Project record
Opened or launched
khaleejtimes.com16 July 2007