How much did Francis Scott Key Bridge (Washington, D.C.) cost to build?

The Francis Scott Key Bridge in Washington, D.C. is the six-lane reinforced concrete arch bridge carrying U.S. Route 29 across the Potomac River between Georgetown and Rosslyn, Virginia, designed by Nathan C. Wyeth in 1916 to replace the old Aqueduct Bridge, begun in 1917 and opened on 17 January 1923, listed on the National Register of Historic Places. The DC Preservation League's historic sites page says the actual total cost of the structure was 2.5 million dollars, although Congress had authorized a new bridge not to exceed one million.

Final project cost

$2.5 million

Cost basis: 1923

Key Bridge crossing the Potomac river as seen from the Georgetown waterfront. Washington, DC is on the right, Rosslyn, Virginia is on the left.
G. Edward JohnsonCC BY 4.0

Cost evidence

Basis of the published figure

Final project cost1923
en.wikipedia.org

Project record

Timeline

  1. 1917

    Construction started

    historicsites.dcpreservation.org
  2. 17 January 1923

    Opened or launched

    DC Historic Sites (DC Preservation League)

Now make the guess

Could you estimate it without seeing the answer?

BudgetGuessr turns real project costs into a daily estimation challenge.

Play BudgetGuessr

Keep exploring

View all projects