How much did Golden Ears Bridge cost to build?

The Golden Ears Bridge is the extradosed bridge of about 976 m with a 244 m main span over the Fraser River in Metro Vancouver, British Columbia, linking Langley and Maple Ridge, procured by TransLink as a design-build-finance-operate public-private partnership with the Golden Crossing Group and built by the Golden Crossing Constructors joint venture of CH2M Hill and Bilfinger Berger from 29 June 2006 to a traffic opening on 16 June 2009. Infrastructure BC lists the project cost as 808 million Canadian dollars.

Final project cost

CAD 808 million

Approximately $707.82 million

Cost basis: 2009

Panorama of Golden Ears Bridge over the Fraser River. 9 photos merged in Photoshop.
David A TrimCC BY 3.0

Cost evidence

Basis of the published figure

Final project cost2009
en.wikipedia.org

Project record

Timeline

  1. 29 June 2006

    Construction started

    infrastructurebc.com
  2. 16 June 2009

    Opened or launched

    infrastructurebc.com