How much did Gotthard Base Tunnel cost to build?

The Gotthard Base Tunnel is the 57.1 km twin-bore railway tunnel through the Alps in Switzerland, the longest railway tunnel in the world, the central part of the New Rail Link through the Alps (NRLA), built over 17 years from 1999 and opened on 1 June 2016. The Swiss government's About Switzerland portal states a total cost of 12.2 billion Swiss francs, which RailwayPRO describes as nearly double the initial estimates of 1998.

Final project cost

CHF 12.2 billion

Approximately $12.38 billion

Cost basis: 2016

Overhead line installation car in the east tube of the Gotthard Base Tunnel at Faido multifunction station
Hannes Ortlieb (Diskussion)CC BY-SA 3.0 de

Cost evidence

Basis of the published figure

Final project cost2016
railwaypro.com

Project metrics

Key dimensions

Total lengthAbout Switzerland
57.1 km

Project record

Opened or launched

RailwayPRO

1 June 2016