Tunnel · Switzerland

How much is earmarked for the second Gotthard road tunnel tube?

The second bore of the Gotthard Road Tunnel is the new 16.9 km tube parallel to the existing A2 road tunnel between Goschenen and Airolo in Switzerland, built by the Federal Roads Office so that the first tube can be refurbished from 2030 to 2033 without closing the route, with the second tube scheduled to open in 2030. The Federal Roads Office states that 2.14 billion Swiss francs has been earmarked for its construction, an estimate with an accuracy of plus or minus 15 percent excluding VAT.

Approved budget

CHF 2.14 billion

Approximately $2.57 billion

Cost basis: 2025

Gotthard-Strassentunnel in einer Nord-Süd-Befahrung Foto: Im Tunnel ein Hinweisschild auf die Radiofrequenzen des Tunnelradios
Raimond SpekkingCC BY-SA 4.0

Cost evidence

Basis of the published figure

Approved budget2025
astra.admin.ch

Project metrics

Key dimensions

Project record

Timeline

  1. 2020

    Construction started

    Federal Roads Office (FEDRO)
  2. 2030

    Current completion estimate

    Federal Roads Office (FEDRO)

Now make the guess

Could you estimate it without seeing the answer?

BudgetGuessr turns real project costs into a daily estimation challenge.

Play BudgetGuessr