Bridge · Norway

How much did Hålogaland bridge cost to build?

The Halogaland Bridge (Halogalandsbrua) is the 1,533 m suspension bridge with a main span of 1,145 m across the Rombaksfjord near Narvik in Nordland, Norway, on the European route E6 above the Arctic Circle, built from 2013 and opened on 9 December 2018, financed 68 percent by the state and 32 percent by tolls. Fremtidens Byggenaering wrote in February 2019 that the whole project came to 4 billion kroner, and Bladet Vesteraalen reported on the opening day that the bridge had cost 4 billion, against 2.2 billion in the Wikipedia article.

Final project cost

NOK 4 billion

Approximately $491.85 million

Cost basis: 2018

Nordnorwegen_2019_0066.jpg
Markus TrienkeCC BY-SA 2.0

Cost evidence

Basis of the published figure

Final project cost2018
blv.no

Project metrics

Key dimensions

Total lengthFremtidens Byggenaering
1,533 m
Main spanFremtidens Byggenaering
1,145 m

Project record

Timeline

  1. 2013

    Construction started

    Fremtidens Byggenaering
  2. 9 December 2018

    Opened or launched

    Fremtidens Byggenaering