How much does I-395 Signature Bridge cost?
The I-395 Signature Bridge is the signature arch bridge of the I-395, SR 836 and I-95 reconstruction in downtown Miami, Florida, built by the Archer Western-De Moya joint venture for the Florida Department of Transportation and the Greater Miami Expressway Agency, with two arches of precast segments and an Underdeck urban park beneath the highway. Miami Today reported on 13 August 2025 that costs had risen from a projected 818 million dollars to 866 million and that the project would now run to late 2029 instead of 2027.
Published project estimate
$866 million
Cost basis: 2025
Cost evidence
Basis of the published figure
Project record
Current completion estimate
Miami Today2029