How much did James A. FitzPatrick Nuclear Power Plant cost to build?

The James A. FitzPatrick Nuclear Power Plant is a single boiling water reactor near Scriba and Oswego in Oswego County, New York, of about 813 MW, begun on 1 September 1968, commissioned on 28 July 1975 and operated since 2017 by Constellation Energy after Entergy sold it to Exelon. Wikipedia gives its construction cost as 1.065 billion dollars in 2007 dollars.

Final project cost

$1.065 billion

Cost basis: 2007

Lake Ontario and Nine Mile Point Nuclear Generating Station.
Michael StyneCC BY-SA 2.0

Cost evidence

Basis of the published figure

Final project cost2007
Wikipedia

Project record

Timeline

  1. 1 September 1968

    Construction started

    Wikipedia (infobox)
  2. 28 July 1975

    Completed

    Wikipedia (infobox)