Bridge 路 Singapore

How much did Keppel Bay Bridge cost to build?

The Keppel Bay Bridge is the 250 m cable-stayed bridge across the strait that links the private Keppel Island to the mainland of Singapore, the longest cable-stayed bridge in the country, with a main pylon and seven asymmetrical cables rising 50 m, jointly designed by DCA Architects and TY Lin International and built by Penta Ocean Construction as the first public bridge constructed by a private developer, then handed over to the Land Transport Authority, and opened on 3 January 2008 by President S R Nathan. The developer's fact sheet and MarineLink both give its cost as about 30 million Singapore dollars.

Reported project cost

SGD 30 million

Approximately $21.2 million

Cost basis: 2008

Keppel Bay Bridge, Singapore.
Erwin Soo from SingaporeCC BY 2.0

Cost evidence

Basis of the published figure

Reported project cost2008
marinelink.com

Project metrics

Key dimensions

Project record

Opened or launched

MarineLink

3 January 2008

Now make the guess

Could you estimate it without seeing the answer?

BudgetGuessr turns real project costs into a daily estimation challenge.

Play BudgetGuessr

Keep exploring

View all projects