How much did Krško Nuclear Power Plant cost to build?

The Krsko Nuclear Power Plant is the single-unit nuclear plant in Krsko, Slovenia, with a Westinghouse two-loop pressurised water reactor of 1,994 MW thermal power and a net output of 696 MW, owned equally by Slovenia and Croatia, which signed a turnkey contract with Westinghouse in August 1974 for a 632 MW plant, laid the foundation stone on 1 December 1974, synchronised the generator in October 1981 and began commercial operation in January 1983. The Wikipedia article states that the plant cost 649.2 million US dollars to build.

Reported project cost

$649.2 million

Cost basis: 1983

Krško Nuclear Power Plant
JanezdrilcCC0

Cost evidence

Basis of the published figure

Reported project cost1983
nek.si

Project metrics

Key dimensions

Project record

Timeline

  1. 1 December 1974

    Construction started

    NEK (Krško Nuclear Power Plant leaflet)
  2. 15 January 1983

    Opened or launched

    nek.si