How much did Kutai Kartanegara Bridge cost to build?

The Kutai Kartanegara Bridge is the steel arch bridge, 710 m long, over the Mahakam River at Tenggarong in East Kalimantan, Indonesia, which replaced the suspension bridge built from 1995 to 2001 that collapsed on 26 November 2011, killing 24 people. The new bridge was built by the state-owned contractor PT Hutama Karya from 10 April 2013 with money from the regional budget (APBD) of the Kutai Kartanegara regency and was reopened on 8 December 2015, at a cost that ANTARA Kalimantan Timur gave as about 191 billion rupiah.

Reported project cost

IDR 191 billion

Approximately $14.27 million

Cost basis: 2015

the picture of kutai kartanegara bridge after collapse on november 26th, 2011. it remain 2 main pillars
KatakutuCC BY-SA 3.0

Cost evidence

Basis of the published figure

Reported project cost2015
id.wikipedia.org

Project metrics

Key dimensions

Project record

Timeline

  1. 10 April 2013

    Construction started

    ANTARA News Kalimantan Timur
  2. 8 December 2015

    Opened or launched

    ANTARA News Kalimantan Timur