Energy · Kenya
What total project cost did the African Development Bank report for Lake Turkana Wind Power?
Lake Turkana Wind Power developed a wind farm in northern Kenya with about 310 MW of generating capacity. The African Development Bank reported a €623 million total project cost in 2019 and described arranging €436 million in senior credit facilities. The larger number is the project cost reported by a lender, not the bank's own loan or an audited turbine-only construction outturn.
Reported project cost
€623 million
Approximately $697.43 million
Cost basis: 2019
george garangCC BY-SA 2.0
Cost evidence
Basis of the published figure
Reported project cost2019
Project metrics
Key dimensions
- PowerAfrican Development Bank
- 310 MW
Project record
Opened or launched
African Development Bank2019