How much did Lötschberg Base Tunnel cost to build?
The Lotschberg Base Tunnel is the 34.6 km railway base tunnel under the Bernese Alps in Switzerland, one of the two centrepieces of the NRLA (NEAT) project with the Gotthard Base Tunnel, whose construction began in 1999, broke through in 2005 and was opened on 15 June 2007 as the longest land tunnel in the world, with regular operation declared on 9 December 2007. swissinfo.ch reported at the opening a final total cost of CHF 5.3 billion, about one billion more than estimated in 1998, while Wikipedia gives CHF 4.3 billion, corrected to 1998 prices.
Final project cost
CHF 5.3 billion
Approximately $4.42 billion
Cost basis: 2007
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthswissinfo.ch
- 34.6 km
Project record