How much did London Array cost to build?

London Array is the offshore wind farm of 175 Siemens 3.6 MW turbines with rotor diameters of 120 m and an installed capacity of 630 MW, about 20 km off the north Kent coast in the Outer Thames Estuary, with onshore work from July 2009, offshore works from March 2011, first power in October 2012, the last turbine installed in December 2012 and a formal inauguration by Prime Minister David Cameron on 4 July 2013, owned by a consortium of RWE, Orsted, CDPQ and Masdar. Wikipedia gives its cost as GBP 1.8 billion, while POWER magazine speaks of a GBP 2 billion (USD 3 billion) project and NS Energy of GBP 3 billion.

Reported project cost

拢1.8 billion

Approximately $2.81 billion

Cost basis: 2013

London Array wind farm as viewed from the air in February 2019 London_Array
BodgesocCC BY-SA 4.0

Cost evidence

Basis of the published figure

Reported project cost2013
uk.rwe.com

Project metrics

Key dimensions

PowerRWE UK
630 MW

Project record

Timeline

  1. 2009

    Construction started

    NS Energy Business
  2. 4 July 2013

    Opened or launched

    RWE UK