What project cost does FHWA list for the Long Beach International Gateway bridge replacement?

The Port of Long Beach replaced the five-lane Gerald Desmond Bridge with a six-lane cable-stayed crossing to improve access for taller ships and port traffic. The U.S. Federal Highway Administration records $1.561 billion for the replacement project, which opened to traffic in October 2020. This is the whole bridge-replacement project figure, not the separate $500 million TIFIA loan within its financing plan.

Reported project cost

$1.561 billion

Cost basis: 2020

Terminal Island bridge by Don Ramey Logan
Don Ramey LoganCC BY-SA 4.0

Cost evidence

Basis of the published figure

Reported project cost2020
fhwa.dot.gov

Project record

5 October 2020