How much did Ludington Pumped Storage Power Plant cost to build?

The Ludington Pumped Storage Power Plant is the pumped-storage hydroelectric station in Pere Marquette Township near Ludington, Michigan, built for Consumers Power and Detroit Edison (owned 51 percent by Consumers Energy and 49 percent by DTE) between 1969 and 1973 and able to produce 1,872 MW at peak, the largest pumped-storage facility in the world at its construction. Construction Equipment Guide wrote in 2017 that it was completed in 1973 at a cost of USD 327 million, as does the Wikipedia infobox, while the Wikipedia text gives USD 315 million.

Reported project cost

$327 million

Cost basis: 1973

Ludington Pumped Storage Power Plant in United States
Paul SequeiraPublic domain

Cost evidence

Basis of the published figure

Reported project cost1973
en.wikipedia.org

Project metrics

Key dimensions

Project record

Timeline

  1. 1969

    Construction started

    Construction Equipment Guide