How much did Maryland Route 200 cost to build?
Maryland Route 200, the Intercounty Connector, is the 18-mile, 6-lane toll road in Maryland delivered by design-build contracts, with Contract A opened in February 2011, Contracts B and C in November 2011 and Contracts D and E in November 2014. The FHWA project profile gives a total cost of 2,386 million dollars per the final financial plan update, financed by 750.0 million of GARVEE bonds, a 516.0 million TIFIA loan and 668.9 million of toll revenue bonds and cash.
Final project cost
$2.386 billion
Cost basis: 2014
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Total lengthFHWA Center for Innovative Finance Support
- 28.968 km
Project record