Bridge · France

How much did Millau Viaduct cost to build?

The Millau Viaduct (Viaduc de Millau) is the cable-stayed road viaduct over the Tarn valley in southern France, 343 m at its tallest pylon, carrying the A75 and A71 motorway axis and built by the Compagnie Eiffage du Viaduc de Millau, a subsidiary of Eiffage that financed it and holds a 75-year toll concession after three years of construction; work began on 16 October 2001, it was inaugurated on 14 December 2004 and opened to traffic on 16 December 2004. Wikipedia gives its construction cost as approximately EUR 394 million, plus EUR 20 million for the toll plaza, and Archi Contemporaine says EUR 350 million had been calculated and about EUR 400 million were actually spent.

Final project cost

€394 million

Approximately $490.1 million

Cost basis: 2004

Millau, eine südfranzösische Stadt im Département Aveyron mit dem Viaduc de Millau (Autobahnbrücke der A75).
W. BulachCC BY-SA 4.0

Cost evidence

Basis of the published figure

Final project cost2004
archicontemporaine.org

Project metrics

Key dimensions

Project record

Timeline

  1. 16 October 2001

    Construction started

    archicontemporaine.org
  2. 16 December 2004

    Opened or launched

    archicontemporaine.org