Bridge · Hungary

How much did Monostor Bridge cost to build?

The Monostori Bridge is the cable-stayed cross-border road bridge of about 600 m over the Danube between Komarom in Hungary and Komarno in Slovakia, the highest bridge on the Danube with a 7,000-tonne steel structure, whose foundation stone was laid on 17 October 2017 and which was inaugurated in September 2020 after three years of work. The European Climate, Infrastructure and Environment Executive Agency states that its total cost was over EUR 117 million, of which just over EUR 100 million (85 percent) came from the EU's CEF Transport programme, whereas Wikipedia only repeats the 2013 estimate of HUF 25 billion.

Reported project cost

€117 million

Approximately $133.64 million

Cost basis: 2020

Newly built Danube bridge between Komárno, Slovakia and Komárom, Hungary.
VermundsCC0

Cost evidence

Basis of the published figure

Reported project cost2020
en.wikipedia.org

Project metrics

Key dimensions

Total lengthCINEA
600 m

Project record

Timeline

  1. 17 October 2017

    Construction started

    cinea.ec.europa.eu
  2. 2020

    Opened or launched

    CINEA