Bridge · Romania

How much did New Europe Bridge cost to build?

The New Europe Bridge (Danube Bridge 2, Vidin-Calafat Bridge) is the 1,971 m extradosed road and rail bridge over the Danube between Vidin in Bulgaria and Calafat in Romania, built by the Spanish company FCC with engineering by Ingerop and High-Point Rendel, financed with grants and loans from the European Commission, the European Investment Bank, the French Development Agency and KfW, officially opened at 16:00 on 14 June 2013 with traffic from midnight on 15 June. Railway Gazette reported a total cost of EUR 275 million, of which Bulgaria contributed EUR 225 million and Romania EUR 50 million, whereas Wikipedia gives EUR 226 million for the bridge and its adjoining infrastructure.

Reported project cost

€275 million

Approximately $365.23 million

Cost basis: 2013

Ansicht der Schrägseilbrücke
UwarfCC BY-SA 3.0

Cost evidence

Basis of the published figure

Reported project cost2013
vidincalafatbridge.bg

Project metrics

Key dimensions

Project record

14 June 2013

Now make the guess

Could you estimate it without seeing the answer?

BudgetGuessr turns real project costs into a daily estimation challenge.

Play BudgetGuessr

Keep exploring

View all projects