How much did Orlando International Airport, Terminal C cost to build?

Terminal C is the first phase of the South Terminal Complex at Orlando International Airport in Florida: a 15-gate airside terminal of about 1.6 million square feet that can handle up to 20 aircraft, with construction begun in 2017 and international operations starting on 19 September 2022. Airport Improvement magazine reported in July 2022 a Terminal C cost of USD 2.75 billion within a USD 4.2 billion South Terminal Complex, while Upgraded Points says Terminal C opened after a USD 2.8 billion investment.

Reported project cost

$2.75 billion

Cost basis: 2022

The terminal of the Orlando International Airport in Orlando, Florida seen from an arriving airplane
Dough4872Public domain

Cost evidence

Basis of the published figure

Reported project cost2022
upgradedpoints.com

Project metrics

Key dimensions

Floor areaAirport Improvement Magazine
148,645 m²

Project record

Timeline

  1. 2017

    Construction started

    airportimprovement.com
  2. 2022

    Opened or launched

    Airport Improvement Magazine