How much did Orlando International Airport, Terminal C cost to build?
Terminal C is the first phase of the South Terminal Complex at Orlando International Airport in Florida: a 15-gate airside terminal of about 1.6 million square feet that can handle up to 20 aircraft, with construction begun in 2017 and international operations starting on 19 September 2022. Airport Improvement magazine reported in July 2022 a Terminal C cost of USD 2.75 billion within a USD 4.2 billion South Terminal Complex, while Upgraded Points says Terminal C opened after a USD 2.8 billion investment.
Reported project cost
$2.75 billion
Cost basis: 2022
Cost evidence
Basis of the published figure
Project metrics
Key dimensions
- Floor areaAirport Improvement Magazine
- 148,645 m²
Project record