Energy 路 United States

How much did Pilgrim Nuclear Power Station cost to build?

The Pilgrim Nuclear Power Station was a single-unit, about 680 MW boiling-water reactor at Plymouth, Massachusetts, whose construction began on 26 August 1968, which began operating in 1972 and closed in 2019 after its owner announced in October 2015 that market conditions and rising costs made it uneconomic. Wikipedia's infobox gives its cost as USD 462.25 million in 2007 dollars, and the Nuclear Decommissioning Collaborative restates the same build as USD 600 million in 2018 dollars.

Reported project cost

$462.25 million

Cost basis: 2007

Boston Edison Company's Pilgrim Station Unit 1 at Plymouth, Mass. An 1800 foot breakwater juts from a two-acre recreation spot called the "Pilgrim Shorefront."
ENERGY.GOVPublic domain

Cost evidence

Basis of the published figure

Reported project cost2007
decommissioningcollaborative.org

Project metrics

Key dimensions

Project record

Timeline

  1. 26 August 1968

    Construction started

    decommissioningcollaborative.org