How much did Regional Connector cost to build?
The Regional Connector is the 1.9-mile Los Angeles Metro subway through downtown that ties three existing rail lines together with three new stations, Little Tokyo/Arts District, Historic Broadway and Grand Av Arts/Bunker Hill. Streetsblog Los Angeles describes it as a 1.8 billion dollar project when Metro opened it on 16 June 2023.
Reported project cost
$1.8 billion
Cost basis: 2023
Justintran95CC BY-SA 4.0
Cost evidence
Basis of the published figure
Reported project cost2023
Project metrics
Key dimensions
- Total lengthStreetsblog Los Angeles
- 3,058 m
Project record
Opened or launched
Streetsblog Los Angeles16 June 2023