How much did the Shams 1 concentrated solar power plant in Abu Dhabi cost to build?

Shams 1 is a 100 MW concentrated solar power plant with parabolic troughs near Madinat Zayed, about 120 km southwest of Abu Dhabi in the United Arab Emirates, developed by Masdar, Total and Abengoa Solar on about 2.5 square kilometres with some 258,000 mirrors, selected in 2010 and inaugurated on 17 March 2013. MEED reported the cost as USD 600 million on 18 March 2013, and TotalEnergies lists it as in operation since March 2013.

Final project cost

$600 million

Cost basis: 2013

Shams 1 Parablic Trough in Abu Dhabi
Masdar OfficialCC BY-SA 2.0

Cost evidence

Basis of the published figure

Final project cost2013
totalenergies.com

Project metrics

Key dimensions

PowerMEED
100 MW

Project record

Timeline

  1. 2010

    Construction started

    TotalEnergies
  2. 17 March 2013

    Opened or launched

    MEED