Energy 路 United States

How much did Shearon Harris Nuclear Power Plant cost to build?

The Shearon Harris Nuclear Power Plant near New Hill, North Carolina, operated by Duke Energy (formerly Progress Energy and Carolina Power & Light), is a single 900 MW pressurised-water reactor built by Westinghouse from 28 January 1978 and in commercial operation since 2 May 1987, on a site designed for four reactors. The US Energy Information Administration's 2010 State Nuclear Profile lists its construction cost as USD 4.115 billion in 2007 dollars, adjusted by the consumer price index from a 1986 EIA report, so it is an inflation-adjusted figure; Wikipedia says the nominal final cost approached USD 3.9 billion.

Reported project cost

$4.115 billion

Cost basis: 2007

Shearon Harris Nuclear Power Plant control room. Simulations and training are run in this room, an exact duplicate of the control room of the operational reactor.
RadioFanCC BY-SA 4.0

Cost evidence

Basis of the published figure

Reported project cost2007
en.wikipedia.org

Project metrics

Key dimensions

Project record

Timeline

  1. 28 January 1978

    Construction started

    U.S. Energy Information Administration
  2. 2 May 1987

    Opened or launched

    U.S. Energy Information Administration