Bridge · Czech Republic

How much did the Sky Bridge 721 suspension bridge at Dolní Morava cost to build?

Sky Bridge 721 is a 721-metre pedestrian suspension bridge at Dolní Morava in the Czech Republic, crossing the Mlýnský potok valley 95 metres above the ground between the Slamník and Chlum ridges, operated by the company Sněžník. The Czech news agency ČTK reported on 9 May 2022 that construction cost roughly CZK 200 million, expected to be recovered from admission fees within ten years, ahead of the opening on Friday 13 May 2022. It briefly held the record for the world's longest pedestrian suspension bridge before being surpassed in 2024.

Reported project cost

CZK 200 million

Approximately $8.56 million

Cost basis: 2022

Sky Bridge 721, Dolní Morava
Tomas.drapalCC BY-SA 4.0

Cost evidence

Basis of the published figure

Reported project cost2022
en.wikipedia.org

Project metrics

Key dimensions

Total lengthČeské Noviny (ČTK)
721 m

Project record

Timeline

  1. 2021

    Construction started

    ceskenoviny.cz
  2. 13 May 2022

    Opened or launched

    České Noviny (ČTK)