How much did Surveyor program cost to build?

The Surveyor program was NASA's series of seven uncrewed lunar lander missions flown from June 1966 to January 1968 to prepare for the Apollo landings; five soft-landed on the Moon and two failed. JPL ran it and chose Hughes Aircraft in 1961 to build the spacecraft. NASA's own history, Kloman's NASA SP-4901 (1972), states that the original estimated total cost of the project was USD 125 million whereas the final cost came to USD 469 million, nearly a fourfold increase largely because the project took more than two years longer than planned.

Final project cost

$469 million

Cost basis: 1968

Apollo 12 - Surveyor 3 and Conrad
Alan Bean Original uploader was Bubba73 at en.wikipediaPublic domain

Cost evidence

Basis of the published figure

Final project cost1968
en.wikipedia.org

Project record

Timeline

  1. 1960

    Construction started

    NASA
  2. 1968

    Completed

    NASA