How much did the Temelín nuclear power station in the Czech Republic cost to complete?

The Temelín Nuclear Power Station in South Bohemia, Czech Republic, is a two-unit VVER-1000 plant owned and operated by ČEZ, begun in 1987 in Czechoslovakia, with first power in December 2000, commercial operation of unit 1 in June 2002 and unit 2 in April 2003. The original four-unit plan was cut to two after 1990. ČEZ states that the total cost finally reached CZK 98.6 billion, matching the CZK 98.58 billion budget in the Czech government's 1999 completion report (1998 prices).

Final project cost

CZK 98.6 billion

Approximately $3.5 billion

Cost basis: 2003

Pohled na chladicí věže a budovy JETE
Ajrocket1CC BY-SA 4.0

Cost evidence

Basis of the published figure

Final project cost2003
vlada.gov.cz

Project metrics

Key dimensions

PowerČEZ Group
2,160 MW

Project record

Timeline

  1. 1987

    Construction started

    ČEZ Group
  2. 18 April 2003

    Completed

    cez.cz