How much did the Térénez cable-stayed bridge in Brittany cost to build?

The Térénez bridge is a 515 m curved cable-stayed road bridge over the Aulne estuary between Argol and Rosnoën in Finistère, Brittany, with a 285 m main span and two 114.9 m side spans, designed by Michel Virlogeux and Charles Lavigne for the Conseil général du Finistère and replacing a 1952 bridge damaged by alkali-aggregate reaction. Construction began in 2007 and it opened to traffic on 17 April 2011 (inaugurated 16 April). Espazium gives its cost as EUR 41.5 million, while Wikipedia says EUR 35 million and the lead contractor's page EUR 29.54 million.

Final project cost

€41.5 million

Approximately $57.77 million

Cost basis: 2011

Pont de Térénez
Donar ReiskofferCC BY 3.0

Cost evidence

Basis of the published figure

Final project cost2011
en.wikipedia.org

Project metrics

Key dimensions

Total lengthDodin Campenon Bernard
515 m

Project record

Timeline

  1. 2007

    Construction started

    Espazium
  2. 17 April 2011

    Opened or launched

    Espazium

Now make the guess

Could you estimate it without seeing the answer?

BudgetGuessr turns real project costs into a daily estimation challenge.

Play BudgetGuessr

Keep exploring

View all projects