Bridge 路 United States

How much did the Veterans Memorial Bridge between Weirton and Steubenville cost?

The Veterans Memorial Bridge is a cable-stayed bridge carrying US 22 over the Ohio River between Weirton, West Virginia, and Steubenville, Ohio. Designed by Michael Baker and about 1,964 ft (599 m) long, it has an 820 ft main river span and a 690 ft back span, and opened to traffic on 1 May 1990; the West Virginia Department of Transportation gives a bridge budget of USD 70 million and more than USD 125 million for the bridge together with 4.5 miles of approach roadway.

Reported project cost

$70 million

Cost basis: 1990

The Veterans Memorial Bridge, which crosses the w:Ohio River and links w:Steubenville, Ohio to w:Weirton, West Virginia.
Doug KerrCC BY-SA 2.0

Cost evidence

Basis of the published figure

Reported project cost1990
en.wikipedia.org

Project metrics

Key dimensions

Total lengthtransportation.wv.gov
598.6 m

Project record

Timeline

  1. 1979

    Construction started

    transportation.wv.gov

Now make the guess

Could you estimate it without seeing the answer?

BudgetGuessr turns real project costs into a daily estimation challenge.

Play BudgetGuessr

Keep exploring

View all projects