Energy 路 United States

How much did Unit 1 of the Virgil C. Summer Nuclear Generating Station cost to build?

The Virgil C. Summer Nuclear Generating Station near Jenkinsville, South Carolina, has a single 966 MW pressurized-water reactor, Unit 1, owned by South Carolina Electric & Gas (55%) and Santee Cooper (45%) and managed during construction by Fluor. Construction began in the early 1970s and the unit entered commercial operation in January 1984 at a cost of USD 1.3 billion; two AP1000 units planned next to it were abandoned in 2017 after Westinghouse's bankruptcy.

Reported project cost

$1.3 billion

Cost basis: 1984

This is a publicity photograph from SCE&G showing V. C. Summer Nuclear Station Unit 1. This photo shows the Reactor Building, which is the concrete cylindrical structure, Turbine Building, which is the large blue building, and the Switchyard, where the electricity is sent from the Nuclear Plant to the grid.
DJSlawSlawCC BY-SA 3.0

Cost evidence

Basis of the published figure

Reported project cost1984
power-technology.com

Project metrics

Key dimensions

Project record

Timeline

  1. 1973

    Construction started

    power-technology.com
  2. 1 January 1984

    Opened or launched

    power-technology.com