Energy · Belarus

How much did the Vitebsk Hydroelectric Power Plant in Belarus cost to build?

The Vitebsk Hydroelectric Power Plant on the Western Dvina river in Belarus is a 40 MW run-of-river plant with four turbines, the country's most powerful hydropower station, designed to generate 138 million kWh a year. Built by the Chinese company CNEEC with a loan from China Development Bank, work began in 2012 and the plant was commissioned in 2017 after five years; the state agency Belta reported its cost as USD 189 million.

Reported project cost

$189 million

Cost basis: 2017

Віцебская ГЭС у лістападзе 2023 года.
ГлебоускіCC BY-SA 4.0

Cost evidence

Basis of the published figure

Reported project cost2017
belarus.by

Project metrics

Key dimensions

Project record

Timeline

  1. 2012

    Construction started

    Belarus.by (Belta)
  2. 2017

    Completed

    Belarus.by (Belta)
  3. 2017

    Opened or launched

    Belarus.by (Belta)