Bridge · United States

How much does Wilburton Trestle cost?

The Wilburton Trestle is a 1,000-foot (305 m) wooden railway trestle in Bellevue, Washington, built in 1904 and described as the longest wooden trestle in the Pacific Northwest, which King County is converting into a trail bridge for the 42-mile Eastrail. The conversion adds an 18–20 ft wide trail surface, railings and three viewing platforms about 100 ft above ground, and links to Sound Transit's Wilburton light rail station on the 2 Line. Work began in June 2024 at $37 million, rose to $43.5 million after crews found widespread rot and failing hardware, and opening is expected in 2027.

Published project estimate

$43.5 million

Cost basis: 2026

created by user brianhe 2005-12-28 Taken from near Bellevue fire station #7 on east side of trestle.
No machine-readable author provided. Brianhe assumed (based on copyright claims).CC BY-SA 3.0

Cost evidence

Basis of the published figure

Published project estimate2026
cdn.kingcounty.gov

Project metrics

Key dimensions

Total lengthKing County, Washington
304.8 m

Project record

Timeline

  1. 3 June 2024

    Construction started

    City of Bellevue