How much did Woodrow Wilson Bridge cost to build?
The Woodrow Wilson Bridge replacement is the 12-lane drawbridge crossing of the Potomac River on the Capital Beltway between Maryland and Virginia, delivered over about 15 years of design and construction. The engineering firm AECOM states that its cost was reduced by 86 million dollars from the original estimate of 2.44 billion dollars to a final cost of 2.35 billion, and that the major interchange work was complete by 2014.
Final project cost
$2.35 billion
Cost basis: 2014
FamartinCC BY-SA 4.0
Cost evidence
Basis of the published figure
Final project cost2014
Project record
Completed
AECOM2014